DEEN
Transport robot in industry
Home/Use Cases/Industry
Use Case · Industry

Industry – Material Flow Without Empty Runs

Setup: the Pudu PuduBot 2 delivers small parts and material to the stations on a fixed cycle, the Pudu T300 handles large loads – on defined routes.

On cycle Material to the station 2 classes Small parts and large loads Fewer trips Staff stay at the line
Starting Point

Pick-up and drop-off runs cost production time

Staff lose time walking between the warehouse, picking and the line. Material supply should run on a plannable cycle – without additional forklift movements in the aisles.

The PuduBot 2 handles small parts and material, the T300 large load carriers. Both run defined routes and can be extended with further stations as demand grows.

PuduBot 2 in industrial use
The Setup

Two transport classes, one system

PuduBot 2
Pudu · Transport
PuduBot 2
Delivers small parts and material between stations on a fixed cycle – reliable even in mixed traffic.
T300
Pudu · Transport
T300
Handles large and heavy load carriers on defined routes.
The Result

What day-to-day use changes

Plannable
Material supply on cycle
Stations are supplied reliably
Fewer empty runs
Robots drive
Staff produce
Safe
defined routes
fewer additional forklift trips in the aisles
Scalable
Stations easily added
the system grows with demand

Metrics will follow once operating data has been evaluated – we only publish figures backed by real reports. Reference anonymised.

Products Used

The machines behind this use case

All transport robots →

More Use Cases

All 9 use cases →

Material flow in your plant? We'll plan the routes with you.

On-site assessment and demonstration – free of charge and without obligation.

WA Tel Book a demo